This document describes how information should be structured within the EGIP Pilot (Stage 0).

For EGIP pilot implementation it defines into more technical details elements identified in Appendix 2 of the “Feasibility  Study  for  a  European Geothermal Information Platform” (WP3 D3.2) (see Appendix 2 “Technical Document For EGIP Implementation). Appendix 2 already identified possible candidate elements for a fully Inspire compliant EGIP portal.

Two information types have been identified by the feasibility study:
-    Structured information : information corresponding to datasets,
-    Unstructured information : related to documents.

Both aspects are addressed by this document.

[....]

Continue reading the complete pdf file. Download